
Full remodels from $62,000
01 / Kitchens
Kitchens
Layouts that fix the work triangle, walls opened with engineered beams, cabinets set level within 1/16 in over 10 ft. Most kitchens take 6 to 10 weeks on site.
- Bearing wall removal with engineer's letter
- Cabinets, quartz and tile installed by our crew
- Lighting plan with under-cabinet and island circuits









